Santana de Parnaiba

Imagens: EQC Engenharia The Project URDI Castelo Branco is a high-standard logistics center located at 580 Benedito Crispim de Oliveira Avenue, Cururuquara, Santana de Parnaíba – SP, 06523-240, Brazil, approximately 500 meters from kilometer 40 of the Castelo Branco Highway (toward São Paulo). The development features four modules totaling 4,450 m² and 7,350 m², with […]
Pacatuba

Imagens: EQC Engenharia The Project This industrial logistics warehouse is located at 11,308 Doutor Menel Steubruck Avenue, Pacatuba – CE, Brazil, and offers 22,968 m² of Gross Leasable Area (GLA) dedicated to the storage and distribution of finished products. Constructed with masonry walls and metal partitions, the facility features a standing-seam aluminum roof with thermal […]
Paulista (Império + Assai)

Imagens: EQC Engenharia The Project This industrial logistics warehouse is located at 5800 BR-101 North Highway, Jaguaribe, Paulista – PE, Brazil, and offers 63,229 m² of total area and mezzanine space, currently 100% leased. The property features a high-strength interlocking-paver truck yard, 50 loading docks equipped with dock levelers, a clear height of 11.6 meters, […]
SPX – CL 03

Imagens: EQC Engenharia The Project Project Participants: Owner: SPX and SANCA Project Management: EQC Engenharia General Contractor: SANCA This development consists of a logistics warehouse complex. The extended construction schedule is primarily due to the need for a preloading embankment process, requiring a minimum duration of six months to achieve adequate soil consolidation before construction […]
SPX – CL 02

Imagens: EQC Engenharia The Project Estimated Completion Date: February 2028 Project Participants: Owner: SPX and SANCA Project Management: EQC Engenharia General Contractor: SANCA This development consists of a logistics warehouse complex. The extended construction schedule is primarily due to the need for a preloading embankment process, requiring a minimum duration of six months to achieve […]
Fulwood – Pouso Alegre

Imagens: EQC Engenharia The Project Estimated Completion Date: January 2026 Final Use: BTS Mercado Livre (Meli) and BTS CEVA Project Participants: Owner: Fulwood Project Management: EQC Engenharia General Contractor: Monto This development is an industrial and logistics park. Phase 1 is currently under construction and includes built-to-suit (BTS) facilities for Mercado Livre (Meli) and CEVA. […]
Fulwood – Governador Celso Ramos

Imagens: EQC Engenharia The Project Completion Date: July 2025 Final Use: BTS Mercado Livre (Meli) Project Participants: Owner: Fulwood Project Management: EQC Engenharia General Contractor: Engemon Construtora This industrial and logistics development has completed Phase 1, which was built as a Build-to-Suit (BTS) facility for Mercado Livre (Meli). Future phases include the construction of additional […]
VBI LOG Jandira

Imagens: EQC Engenharia The Project VBI LOG Jandira is situated on a site with a total area of 191,249.01 m². The property includes a logistics warehouse and supporting ancillary buildings, with a total gross built area (GBA) of 45,599.32 m². Strategically located in the metropolitan region of São Paulo, the asset is designed to support […]
VBI LOG Araucária

Imagens: EQC Engenharia The Project VBI LOG Araucária – Land area of 224,820.05 m² and a built area of 48,487.01 m². It consists of a warehouse with a recent renovation including the addition of a crossdocking system and the installation of a mezzanine. Main Designers and Consultants: Earthworks, Drainage and Paving: Infras Plumbing and Sanitary […]
EPL Seropédica

Imagens: EQC Engenharia The Project Adaptation of the 7,800 m² area leased by EPL (an Indian multinational) for the assembly of its first packaging factory in Brazil. The services included civil renovation and assembly of all utilities necessary for the operation of the new factory (electrical, plumbing, chilled water, compressed air, air conditioning, etc.) The […]