Edition #11 — Engineering in Motion

The performance of a real estate development is the result of the technical decisions made throughout its entire lifecycle. From conception to operation, the governance structure applied at each stage determines execution predictability and the preservation of invested capital.

In June, EQC managed projects at different scales and stages, from the logistics condominium in Extrema, Minas Gerais, currently in the earthworks and foundation phases, to the Mercado Livre Logistics Center in Jacareí, with more than 134,000 m² of built area. During the same period, EQC participated in INFRA FM 2026, the largest Facility Management event in Latin America, and celebrated the 50th edition of We Share.

20,000 People Follow EQC’s Technical Perspective

EQC has reached the milestone of 20,000 followers who engage with its perspective on engineering, management, and project development.

This milestone reinforces EQC’s growing presence across different market segments, driven by technical expertise, governance, and strategic oversight throughout every stage of development, alongside clients, partners, and teams committed to excellence, efficiency, and results.


A technical audience is built with the same consistency as a construction project: one stage at a time.

Logistics Condominium in Extrema, Minas Gerais

In Extrema, Minas Gerais, the logistics condominium is progressing under EQC’s technical management, with multiple work fronts underway simultaneously: earthworks, foundations, structures, and installations.

EQC’s role integrates quality control, coordination across disciplines, and schedule compliance at every stage, maintaining execution predictability even with multiple activities progressing in parallel.

Simultaneous work fronts require technical coordination to ensure that speed does not compromise control.

We Share | 50th Edition

EQC held the 50th edition of We Share, an event designed to promote knowledge sharing and strengthen the company’s culture by fostering connections among its professionals.

With teams operating across different regions of Brazil and around the world, We Share brings professionals closer together, expands access to training, and reinforces integration among teams, supporting a workforce aligned with EQC’s values and prepared to deliver results collaboratively.

A company’s technical consistency begins with the consistency of its team.

Logistics Complex in Cajamar, São Paulo | Phases 02 and 03

Construction of the logistics complex in Cajamar, São Paulo, continues to progress under EQC’s management. With Phase 01 already completed, work is now focused on Phases 02 and 03, including foundations, internal paving, roofing, and panel enclosure.

Monitoring each stage helps ensure quality, efficiency, and schedule compliance as the development moves forward.

Completing one phase does not end technical oversight; it simply shifts its focus to the next.

INFRA FM 2026 | Intelligence in Asset Management

EQC attended INFRA FM 2026, the largest Facility Management, Property Management, and Workplace Management event in Latin America, closely following the discussions that are reshaping real estate asset management.

Among the key highlights was the growing use of artificial intelligence and data in Facilities Management, supporting data-driven maintenance, building automation, and energy efficiency aligned with the ESG agenda. These trends reinforce EQC’s direction: operating assets with greater intelligence, performance, and a long-term perspective.


Asset management evolves as technical information becomes increasingly integrated into decision-making.

Mercado Livre Logistics Center | 134,000 m² in Jacareí

With more than 134,000 m² of built area, the Mercado Livre Logistics Center in Jacareí, São Paulo, was developed for a large-scale operation, with infrastructure designed for efficiency, agility, and high logistics performance.

The project is managed by EQC, with oversight across the different stages of the development and a focus on process coordination, execution control, and alignment with the investment objectives.

Architectural design and photographic records: Marcel Monacelli Arquitetura.

In large-scale operations, technical coordination is what turns scale into performance.

Lifting of the First Column | Capitânia Project, Jacareí

The Capitânia project in Jacareí, São Paulo, reached an important milestone: the lifting of the first structural column, marking the beginning of the assembly of the elements that will shape the development.

Each operation is carried out with planning, precision, and technical oversight, ensuring safety and quality throughout every stage of execution.

The first column is technical before it is symbolic: it is where the project’s planning takes physical form.